Coro Intersects Substantial Copper Mineralization in First 8 Holes of Marimaca Drilling
abril 28, 2016
News Release 16-03
April 28 2016, Marimaca Copper Corp. (“Coro” or the “Company”) (TSX Symbol: COP) is pleased to announce the results of the first 8 holes from a recently completed 16 hole, 2680m reverse circulation (RC) drilling program at its Marimaca copper project, located 22km E of the port of Mejillones in the II Region of Chile. (Fig. 1)
The Marimaca property contains a number of N-S trending, ~60OE dipping, broad shear zones, cross cut by later NE-SW oriented sub vertical feeder structures, all hosted by Jurassic age intrusive rocks. The intersection of these structures has produced wide NW-SE oriented zones of eastward dipping mineralization that have been exploited from a series of open cuts and small underground workings by artisanal miners. Coro’s program is the first ever drilling carried out on the property and tested the larger West Zone and a smaller East Zone; other zones of mineralization as defined by old workings, anomalous rock geochemistry and outcropping copper oxides remain to be tested.
Drilling Results
The West Zone is defined by a series of open cuts extending over ~700m length and was tested by holes MAR-02, -03, -04, and -08. All four holes intersected broad zones of good grade, mostly oxide mineralization over significant widths as shown in Table 1. Results are pending for the remaining 8 holes, MAR-09 to MAR-16, which were all drilled in the West Zone.
Table 1: Marimaca West Zone Intersections
The East Zone is defined by geological mapping, old workings and anomalous rock geochemistry over a minimum length of ~200m and was tested by holes MAR-01, -05, -06 and -07. All four holes intersected good grade oxide, mixed and secondary sulphide (enriched) mineralization over significant widths as shown in Table 2.
Table 2: Marimaca East Zone Intersections
Alan Stephens, President and CEO of Marimaca Coppercommented, “We are delighted by these initial results from our drilling program at Marimaca with many holes bottoming in mineralization, and confirming the potential for a sizeable leachable copper deposit in a great location. We look forward to announcing the results from the second batch of drill holes, together with a fuller description of the mineralization, shortly.”
Sampling and Assay Protocol
True widths cannot be determined with the information available at this time. Marimaca CopperRC holes were sampled on a 2 m continuous basis, with dry samples riffle split on site and one quarter sent to the Geolaquim laboratory in Copiapo, Chile by Marimaca Copperpersonnel for preparation and assaying. A second quarter was stored on site for reference. Samples were prepared using the following standard protocol: drying, crushing to better than 80% passing -10#, homogenizing, splitting and pulverizing a 400 g subsample to 95% passing -150#. All holes were assayed for CuT (total copper) and CuS (acid soluble copper) by AAS. A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed with acceptable results.
Sergio Rivera, Vice President of Exploration, Marimaca Copper Corp, a geologist with more than 32 years of experience and a member of the Colegio de Geologos de Chile and of the Instituto de Ingenieros de Minas de Chile, was responsible for the design and execution of the exploration program and is the Qualified Person for the purposes of NI 43-101. Alan Stephens, FIMMM, President and CEO, of Marimaca Copper Corp, a geologist with more than 39 years of experience, and a Qualified Person for the purposes of NI 43-101, is responsible for the contents of this news release.
About Marimaca
Marimaca is an early stage copper oxide prospect located in the Coastal Range belt of Mesozoic copper deposits of northern Chile. Other significant currently or recently producing deposits in the belt include Mantos Blancos, Michilla, Ivan and Mantos de la Luna.
Marimaca Copperhas the right to earn a 75% interest in the property as follows;
- 51% interest earned in Compañia Minera Newco Marimaca (CMNM) with a $125k payment together with completion of an NI43-101 resource estimate and engineering study that demonstrates the technical and economic feasibility of producing a minimum of 1.5ktpy Cu cathode by August 6th 2018 at Coro’s cost,
- Additional 24% interest in CMNM earned by Marimaca Copperupon obtaining financing for the project construction
- The owner’s interest will comprise a 15% interest free carried to commencement of commercial production and a 10% participating interest subject to dilution. The owners at their election may request Marimaca Copperto loan them the equity portion corresponding to their 10% interest, if any, recoverable by Marimaca Copperfrom 100% of the project’s free cash flow after debt repayments
- Marimaca Copperretains a first right of refusal
Fig 1: Marimaca Location
Fig 2: Marimaca Drill Plan
Table 3: Marimaca Drill Collars
CORO MINING CORP.
“Alan Stephens”
Alan Stephens
President and CEO
About Marimaca Copper Corp.:
Coro’s strategy is to grow a mining business through the discovery, development and operation of “Marimaca Coppertype” deposits. These are defined as projects at whatever stage of development, that are well located with respect to infrastructure and water, which have low permitting risk, and which have the potential to achieve a short and cost effective timeline to production. Our preference is for open pit heap leach copper projects, where we will seek to minimise capital investment rather than maximise NPV, where we will prioritise profitability over production rate, and finally, where the likely capital cost is financeable relative to our market capitalization. The Company’s assets include its 65% interest in SCM Berta; the Planta Prat and Marimaca projects; the Llancahue prospect, optioned to Industrias Peñoles; and a royalty on the San Jorge copper-gold project located in Argentina.
For further information please visit the Company’s website at www.coromining.com or contact Michael Philpot, Executive Vice-President at (604) 682 5546 or [email protected]
This news release includes certain “forward-looking statements” under applicable Canadian securities legislation. Such forward-looking statements or information, include but are not limited to those with respect to the geological potential and size of Marimaca. Forward-looking statements involve known and unknown risks, uncertainties and other factors which are beyond Coro’s ability to predict or control and may cause Coro’s actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but are not limited to, the operation of the Nora Plant, copper price volatility, and changes in debt and equity markets. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company’s documents filed from time to time with the securities regulators in the Provinces of British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, New Brunswick, Nova Scotia, Prince Edward Island and Newfoundland and Labrador.
Accordingly, readers should not place undue reliance on forward-looking statements. Marimaca Copperundertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.