{"id":7496,"date":"2023-02-06T08:56:26","date_gmt":"2023-02-06T13:56:26","guid":{"rendered":"https:\/\/marimaca.com\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/"},"modified":"2026-03-24T07:04:28","modified_gmt":"2026-03-24T11:04:28","slug":"marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m","status":"publish","type":"post","link":"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/","title":{"rendered":"Marimaca Anuncia Resultados Finales del Programa de Perforaci\u00f3n Diamante 2022 \u2013 MAD-18 Intercepta 346\u202fm a 0.71% CuT desde 4\u202fm, Incluyendo 90\u202fm a 1.22% CuT desde 54\u202fm"},"content":{"rendered":"<p><b><span dir=\"auto\">Vancouver, Columbia Brit\u00e1nica, 6\u00a0<\/span><\/b><b><span dir=\"auto\">de febrero\u00a0<\/span><\/b><b><span dir=\"auto\">de 2023 \u2013 Marimaca Copper Corp. (\u201cMarimaca Copper\u201d o la \u201cCompa\u00f1\u00eda\u201d)\u00a0<\/span><\/b><b><span dir=\"auto\">(TSX: MARI)\u00a0<\/span><\/b><span dir=\"auto\">se complace en anunciar los resultados finales de perforaci\u00f3n diamantina (\u201cDDH\u201d) de la campa\u00f1a de perforaci\u00f3n geol\u00f3gica y geot\u00e9cnica de 2022. Los resultados que se informan en este comunicado comprenden 2762 m de perforaci\u00f3n en 12 pozos ubicados en el dep\u00f3sito central de \u00f3xido de Marimaca (\u201cMOD\u201d) y \u00e1reas objetivo de la pared del tajo (para fines geot\u00e9cnicos) alrededor del per\u00edmetro del MOD. Estos resultados son los an\u00e1lisis finales del programa de circulaci\u00f3n inversa y DDH de 2022. Marimaca ha finalizado los planes para el programa de exploraci\u00f3n del primer trimestre de 2023, que dar\u00e1 seguimiento al pozo DDH MAD-22 previamente publicado, que intercept\u00f3 sulfuros primarios (predominantemente calcopirita) en la parte inferior del MOD (92 m con 2,11 % de CuT de 140 m, incluidos 22 m con 5,27 % de CuT).<\/span><\/p>\n<p><b><u><span dir=\"auto\">Reflejos<\/span><\/u><\/b><\/p>\n<ul>\n<li><b><span dir=\"auto\">La perforaci\u00f3n geol\u00f3gica se centr\u00f3 en la zona central del MOD y se orient\u00f3 a 220\u00b0 de azimut, apuntando a las intersecciones transversales de las estructuras de falla noroeste y oeste-noroeste que controlan de manera dominante la mineralizaci\u00f3n en el MOD.<\/span><\/b>\n<ul>\n<li><b><span dir=\"auto\">Las perforaciones diamantinas geol\u00f3gicas de 2022 totalizaron 1.600 m distribuidos en seis pozos (MAD-18, MAD-17, LAD-10, ATD-15, MAD-21, ATD-14).<\/span><\/b><\/li>\n<\/ul>\n<\/li>\n<li><b><span dir=\"auto\">Las perforaciones geot\u00e9cnicas se centraron en la periferia del MOD y se realizaron para recopilar informaci\u00f3n geot\u00e9cnica sobre las zonas de la pared del pozo del MOD.<\/span><\/b>\n<ul>\n<li><b><span dir=\"auto\">No obstante, todos los sondeos interceptaron zonas mineralizadas significativas, cercanas a la superficie, con leyes iguales o muy superiores al promedio de la Estimaci\u00f3n de Recursos Minerales de octubre de 2022.<\/span><\/b><\/li>\n<li><b><span dir=\"auto\">Las perforaciones geot\u00e9cnicas diamantinas de 2022 totalizaron 1.402 m en siete pozos de perforaci\u00f3n, incluidos los ya publicados MAD-22 (ATD-16, ATD-17, ATD-18, MAD-20, LAD-11, MAD-19).<\/span><\/b><\/li>\n<\/ul>\n<\/li>\n<li><b><span dir=\"auto\">Entre los aspectos m\u00e1s destacados de los resultados publicados se incluyen:<\/span><\/b>\n<ul>\n<li><b><span dir=\"auto\">MAD-18 intercept\u00f3 346 m con un 0,71 % de CuT desde 4 m, incluyendo 90 m con un 1,22 % de CuT desde 54 m y 74 m con un 1,17 % de CuT desde 276 m.<\/span><\/b><\/li>\n<li><b><span dir=\"auto\">MAD-17 intercept\u00f3 140 m con un 0,50 % de CuT desde 12 m, incluyendo 12 m con un 1,89 % de CuT desde 140 m.<\/span><\/b><\/li>\n<li><b><span dir=\"auto\">ATD-15 intercept\u00f3 110 m con un 0,49 % de CuT desde los 18 m, incluyendo 30 m con un 1,07 % de CuT desde los 26 m.<\/span><\/b><\/li>\n<li><b><span dir=\"auto\">ATD-14 intercept\u00f3 62 m con un 0,78 % de CuT desde los 102 m, incluyendo 10 m con un 1,76 % de CuT desde los 154 m.<\/span><\/b><\/li>\n<li><b><span dir=\"auto\">LAD-10 intercept\u00f3 176 m con una pendiente del 0,46 % desde los 114 m.<\/span><\/b><\/li>\n<li><b><span dir=\"auto\">MAD-19 intercept\u00f3 46 m con un 0,49 % de CuT desde los 40 m, incluyendo 24 m con un 0,77 % de CuT desde los 62 m.<\/span><\/b><\/li>\n<li><b><span dir=\"auto\">MAD-21 intercept\u00f3 36 m con un 0,47 % de CuT desde la superficie.<\/span><\/b><\/li>\n<\/ul>\n<\/li>\n<li><b><span dir=\"auto\">Los resultados de la campa\u00f1a de perforaci\u00f3n geol\u00f3gica se incorporar\u00e1n al modelo geol\u00f3gico actualizado de 2023 que respalda la MRE planificada para 2023, mientras que la informaci\u00f3n sobre la calidad de la roca obtenida de la perforaci\u00f3n geot\u00e9cnica se utilizar\u00e1 en los flujos de trabajo de desarrollo de 2023.<\/span><\/b><\/li>\n<\/ul>\n<p><b><i><span dir=\"auto\">Sergio Rivera, vicepresidente de exploraci\u00f3n de Marimaca Copper, coment\u00f3:<\/span><\/i><\/b><\/p>\n<p><i><span dir=\"auto\">\u201cLos aproximadamente 3000 metros de perforaci\u00f3n diamantina realizados junto con nuestro programa de perforaci\u00f3n de relleno de circulaci\u00f3n inversa de aproximadamente 38 500 metros en 2022 nos brindan informaci\u00f3n valiosa para nuestra pr\u00f3xima fase de estudios en el Proyecto Marimaca. Los resultados de la perforaci\u00f3n geol\u00f3gica, en el MOD central, confirman nuestra interpretaci\u00f3n actual del modelo de mineralizaci\u00f3n del MOD, en particular las estructuras importantes para la mineralizaci\u00f3n de mayor ley. Esta informaci\u00f3n tambi\u00e9n es particularmente \u00fatil al considerar los excelentes resultados de MAD-22, que estamos complementando con perforaciones adicionales durante el primer trimestre de 2023.\u201d<\/span><\/i><\/p>\n<p><i><span dir=\"auto\">\u201cEl proyecto MAD-22 representa una oportunidad atractiva para la creaci\u00f3n de valor en el Ministerio de Defensa, pero tambi\u00e9n nos ha llevado a reexaminar nuestro modelo de exploraci\u00f3n de objetivos satelitales y estamos observando con renovado inter\u00e9s nuestro extenso paquete de terrenos.<\/span><\/i><\/p>\n<p><i><span dir=\"auto\">\u201cLos trabajos para la entrega del MRE actualizado, que busca convertir los recursos de las categor\u00edas Inferidos a Medidos e Indicados, avanzan satisfactoriamente. Incorporar\u00e1 las perforaciones restantes de los 41.500 m de perforaci\u00f3n RC y diamantina completadas en 2022, incluyendo la zona superficial de alta ley recientemente descubierta en el extremo norte del MOD, que creemos tendr\u00e1 implicaciones positivas para la ley promedio y la dotaci\u00f3n mineral.\u201d<\/span><\/i><\/p>\n<p><b><span dir=\"auto\">Descripci\u00f3n general de los objetivos de la campa\u00f1a de perforaci\u00f3n<\/span><\/b><\/p>\n<p><span dir=\"auto\">La campa\u00f1a de perforaci\u00f3n de Marimaca de 2022 consisti\u00f3 en m\u00e1s de 41.500 m de perforaci\u00f3n RC y diamantina entre el relleno MOD y la zona MAMIX, la extensi\u00f3n en profundidad del MOD. El MRE de 2022, anunciado el 13 de octubre de 2022, incorpora 19.580 m de los aproximadamente 41.500 m de perforaci\u00f3n completados en 2022, para un total de m\u00e1s de 110.000 m de perforaci\u00f3n completados desde 2016. El resto del programa de perforaci\u00f3n de relleno de 2022 se incluir\u00e1 en el MRE de 2023 previsto para principios del segundo trimestre, con el objetivo de convertir los Recursos Inferidos en Categor\u00edas Medidas e Indicadas para fundamentar un Estudio Definitivo de Factibilidad (DFS).<\/span><\/p>\n<p><b><span dir=\"auto\">Figura 1: Vista en planta de los resultados de la perforaci\u00f3n de relleno.<\/span><\/b><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-7489 lazyloaded\" src=\"https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/1.png\" sizes=\"auto, (max-width: 1250px) 100vw, 1250px\" srcset=\"https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/1.png 1250w, https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/1-245x300.png 245w, https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/1-837x1024.png 837w, https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/1-768x940.png 768w\" alt=\"\" width=\"1250\" height=\"1530\" data-ll-status=\"loaded\" \/><\/p>\n<p><b><span dir=\"auto\">Tabla 1. Resumen de los resultados de la perforaci\u00f3n.<\/span><\/b><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-7491 lazyloaded\" src=\"https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/2.png\" sizes=\"auto, (max-width: 1316px) 100vw, 1316px\" srcset=\"https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/2.png 1316w, https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/2-289x300.png 289w, https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/2-985x1024.png 985w, https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/2-768x798.png 768w\" alt=\"\" width=\"1316\" height=\"1368\" data-ll-status=\"loaded\" \/><\/p>\n<p><span dir=\"auto\">*Agujero terminado debido a la intersecci\u00f3n con galer\u00eda artesanal<\/span><\/p>\n<p><b><span dir=\"auto\">Tabla 2. Collares de perforaci\u00f3n y levantamiento topogr\u00e1fico<\/span><\/b><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-7493 lazyloaded\" src=\"https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/3.png\" sizes=\"auto, (max-width: 1304px) 100vw, 1304px\" srcset=\"https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/3.png 1304w, https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/3-300x124.png 300w, https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/3-1024x422.png 1024w, https:\/\/marimaca.com\/wp-content\/uploads\/2023\/02\/3-768x317.png 768w\" alt=\"\" width=\"1304\" height=\"538\" data-ll-status=\"loaded\" \/><\/p>\n<p><b><span dir=\"auto\">Protocolo de muestreo y an\u00e1lisis<\/span><\/b><\/p>\n<p><span dir=\"auto\">Los anchos reales no se pueden determinar con la informaci\u00f3n disponible en este momento. Los agujeros DDH se muestrearon de forma continua a 2 m, se dividieron por la mitad con un divisor de n\u00facleos convencional en el sitio y una mitad se envi\u00f3 al laboratorio de preparaci\u00f3n de ensayos anal\u00edticos de Andes en Calama y las pulpas luego se enviaron al mismo laboratorio de la empresa en Santiago para su an\u00e1lisis. Las muestras se prepararon utilizando el siguiente protocolo est\u00e1ndar: secado; trituraci\u00f3n de toda la muestra a -1\/4\u201d y paso por una trituradora secundaria a mejor del 80% que pasa -10#; homogeneizaci\u00f3n; divisi\u00f3n; pulverizaci\u00f3n de una submuestra de 400-600 g al 95% que pasa -150#; y una divisi\u00f3n de 125 g de esta se envi\u00f3 para an\u00e1lisis. Todas las muestras se analizaron para %CuT (cobre total) y %CuS (cobre soluble en \u00e1cido) por AAS. Se emple\u00f3 un programa completo de QA\/QC, que incluy\u00f3 la inserci\u00f3n de blancos apropiados, est\u00e1ndares y duplicados con resultados aceptables. Las pulpas y los rechazos de muestras son almacenados por Marimaca Copper para futuras referencias.<\/span><\/p>\n<p><b><span dir=\"auto\">Persona cualificada<\/span><\/b><\/p>\n<p><span dir=\"auto\">La informaci\u00f3n t\u00e9cnica contenida en este comunicado de prensa, incluyendo la informaci\u00f3n relativa a geolog\u00eda, perforaci\u00f3n y mineralizaci\u00f3n, fue preparada bajo la supervisi\u00f3n de, o revisada por, Sergio Rivera, vicepresidente de Exploraci\u00f3n de Marimaca Copper Corp, ge\u00f3logo con m\u00e1s de 35 a\u00f1os de experiencia y miembro del Colegio de Ge\u00f3logos de Chile, del Instituto de Ingenieros de Minas de Chile y de la Sociedad de Ge\u00f3logos Econ\u00f3micos de EE. UU., y quien es la Persona Calificada para los fines de la NI 43-101 responsable del dise\u00f1o y la ejecuci\u00f3n del programa de perforaci\u00f3n.<\/span><\/p>\n<p><span dir=\"auto\">La persona cualificada confirma que ha visitado la zona del proyecto, ha revisado la informaci\u00f3n pertinente del mismo, es responsable de la informaci\u00f3n contenida en este comunicado de prensa y da su consentimiento para su publicaci\u00f3n.<\/span><\/p>\n<p><b><span dir=\"auto\">Informaci\u00f3n de contacto<\/span><\/b><br \/>\n<span dir=\"auto\">Para obtener m\u00e1s informaci\u00f3n, visite www.marimaca.com o p\u00f3ngase en contacto con:<\/span><\/p>\n<p><b><span dir=\"auto\">Tavistock\u00a0<\/span><\/b><br \/>\n<b><span dir=\"auto\">+44 (0) 207 920 3150<\/span><\/b><br \/>\n<span dir=\"auto\">Emily Moss \/ Adam Baynes<\/span><br \/>\n<span dir=\"auto\">marimaca@tavistock.co.uk<\/span><\/p>\n<p><b><span dir=\"auto\">Declaraciones prospectivas<\/span><\/b><\/p>\n<p><span dir=\"auto\">Este comunicado de prensa incluye ciertas \u00abdeclaraciones prospectivas\u00bb conforme a la legislaci\u00f3n canadiense aplicable en materia de valores. No se puede garantizar que dichas declaraciones sean precisas, y los resultados reales y los eventos futuros podr\u00edan diferir sustancialmente de los previstos en ellas. Las declaraciones prospectivas reflejan las creencias, opiniones y proyecciones a la fecha de su emisi\u00f3n y se basan en una serie de supuestos y estimaciones que, si bien Marimaca Copper considera razonables, est\u00e1n inherentemente sujetas a importantes incertidumbres y contingencias comerciales, econ\u00f3micas, competitivas, pol\u00edticas y sociales. Numerosos factores, tanto conocidos como desconocidos, podr\u00edan provocar que los resultados, el desempe\u00f1o o los logros reales difieran sustancialmente de los expresados \u200b\u200bo impl\u00edcitos en dichas declaraciones prospectivas, y las partes han formulado supuestos y estimaciones basados \u200b\u200ben muchos de estos factores o relacionados con ellos. Estos factores incluyen, entre otros: riesgos relacionados con el precio de las acciones y las condiciones del mercado, los riesgos inherentes a la miner\u00eda, exploraci\u00f3n y desarrollo de propiedades minerales, las incertidumbres en la interpretaci\u00f3n de los resultados de perforaci\u00f3n y otros datos geol\u00f3gicos, la fluctuaci\u00f3n de los precios de los metales, la posibilidad de retrasos en los proyectos o sobrecostos, o costos operativos y gastos excesivos imprevistos, incertidumbres relacionadas con la necesidad de financiamiento, la disponibilidad y los costos del financiamiento necesario en el futuro, as\u00ed como los factores divulgados en el formulario de informaci\u00f3n anual de la Compa\u00f1\u00eda con fecha del 28 de marzo de 2022, el prospecto base abreviado final y otros documentos presentados por la Compa\u00f1\u00eda ante las autoridades reguladoras de valores canadienses (que pueden consultarse en www.sedar.com). Por consiguiente, los lectores no deben confiar indebidamente en las declaraciones prospectivas. Marimaca Copper no asume ninguna obligaci\u00f3n de actualizar p\u00fablicamente ni de revisar de otro modo las declaraciones prospectivas contenidas en este documento, ya sea como resultado de nueva informaci\u00f3n o eventos futuros o de otro modo, salvo que lo exija la ley.<\/span><\/p>\n<p><span dir=\"auto\">Ni la Bolsa de Valores de Toronto ni la Organizaci\u00f3n Reguladora de la Industria de Inversiones de Canad\u00e1 asumen responsabilidad alguna por la idoneidad o exactitud de este comunicado.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vancouver, Columbia Brit\u00e1nica, 6\u00a0de febrero\u00a0de 2023 \u2013 Marimaca Copper Corp. (\u201cMarimaca Copper\u201d o la \u201cCompa\u00f1\u00eda\u201d)\u00a0(TSX: MARI)\u00a0se complace en anunciar los resultados finales de perforaci\u00f3n diamantina (\u201cDDH\u201d) de la campa\u00f1a de perforaci\u00f3n geol\u00f3gica y geot\u00e9cnica de 2022. Los resultados que se informan en este comunicado comprenden 2762 m de perforaci\u00f3n en 12 pozos ubicados en el [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":1057,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[3],"tags":[],"period":[123],"class_list":["post-7496","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categorizar","period-123"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Marimaca Anuncia Resultados Finales del Programa de Perforaci\u00f3n Diamante 2022 \u2013 MAD-18 Intercepta 346\u202fm a 0.71% CuT desde 4\u202fm, Incluyendo 90\u202fm a 1.22% CuT desde 54\u202fm - Marimaca<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Marimaca Anuncia Resultados Finales del Programa de Perforaci\u00f3n Diamante 2022 \u2013 MAD-18 Intercepta 346\u202fm a 0.71% CuT desde 4\u202fm, Incluyendo 90\u202fm a 1.22% CuT desde 54\u202fm - Marimaca\" \/>\n<meta property=\"og:description\" content=\"Vancouver, Columbia Brit\u00e1nica, 6\u00a0de febrero\u00a0de 2023 \u2013 Marimaca Copper Corp. (\u201cMarimaca Copper\u201d o la \u201cCompa\u00f1\u00eda\u201d)\u00a0(TSX: MARI)\u00a0se complace en anunciar los resultados finales de perforaci\u00f3n diamantina (\u201cDDH\u201d) de la campa\u00f1a de perforaci\u00f3n geol\u00f3gica y geot\u00e9cnica de 2022. Los resultados que se informan en este comunicado comprenden 2762 m de perforaci\u00f3n en 12 pozos ubicados en el [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/\" \/>\n<meta property=\"og:site_name\" content=\"Marimaca\" \/>\n<meta property=\"article:published_time\" content=\"2023-02-06T13:56:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-24T11:04:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/marimaca.com\/wp-content\/uploads\/2020\/09\/20-9-28.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Antonio Serrano\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Antonio Serrano\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\\\/\"},\"author\":{\"name\":\"Antonio Serrano\",\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/#\\\/schema\\\/person\\\/1b14a2c79ba226e74d6a7e418fe9e7b9\"},\"headline\":\"Marimaca Anuncia Resultados Finales del Programa de Perforaci\u00f3n Diamante 2022 \u2013 MAD-18 Intercepta 346\u202fm a 0.71% CuT desde 4\u202fm, Incluyendo 90\u202fm a 1.22% CuT desde 54\u202fm\",\"datePublished\":\"2023-02-06T13:56:26+00:00\",\"dateModified\":\"2026-03-24T11:04:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\\\/\"},\"wordCount\":1650,\"image\":{\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/marimaca.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/20-9-28.jpg\",\"articleSection\":[\"Sin categorizar\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\\\/\",\"url\":\"https:\\\/\\\/marimaca.com\\\/es\\\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\\\/\",\"name\":\"Marimaca Anuncia Resultados Finales del Programa de Perforaci\u00f3n Diamante 2022 \u2013 MAD-18 Intercepta 346\u202fm a 0.71% CuT desde 4\u202fm, Incluyendo 90\u202fm a 1.22% CuT desde 54\u202fm - Marimaca\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/marimaca.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/20-9-28.jpg\",\"datePublished\":\"2023-02-06T13:56:26+00:00\",\"dateModified\":\"2026-03-24T11:04:28+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/#\\\/schema\\\/person\\\/1b14a2c79ba226e74d6a7e418fe9e7b9\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/marimaca.com\\\/es\\\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\\\/#primaryimage\",\"url\":\"https:\\\/\\\/marimaca.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/20-9-28.jpg\",\"contentUrl\":\"https:\\\/\\\/marimaca.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/20-9-28.jpg\",\"width\":1920,\"height\":1440},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/marimaca.com\\\/es\\\/\",\"name\":\"Marimaca\",\"description\":\"The Marimaca Copper\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/marimaca.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/#\\\/schema\\\/person\\\/1b14a2c79ba226e74d6a7e418fe9e7b9\",\"name\":\"Antonio Serrano\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"caption\":\"Antonio Serrano\"},\"url\":\"https:\\\/\\\/marimaca.com\\\/es\\\/author\\\/admin-marimaca\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Marimaca Anuncia Resultados Finales del Programa de Perforaci\u00f3n Diamante 2022 \u2013 MAD-18 Intercepta 346\u202fm a 0.71% CuT desde 4\u202fm, Incluyendo 90\u202fm a 1.22% CuT desde 54\u202fm - Marimaca","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/","og_locale":"es_ES","og_type":"article","og_title":"Marimaca Anuncia Resultados Finales del Programa de Perforaci\u00f3n Diamante 2022 \u2013 MAD-18 Intercepta 346\u202fm a 0.71% CuT desde 4\u202fm, Incluyendo 90\u202fm a 1.22% CuT desde 54\u202fm - Marimaca","og_description":"Vancouver, Columbia Brit\u00e1nica, 6\u00a0de febrero\u00a0de 2023 \u2013 Marimaca Copper Corp. (\u201cMarimaca Copper\u201d o la \u201cCompa\u00f1\u00eda\u201d)\u00a0(TSX: MARI)\u00a0se complace en anunciar los resultados finales de perforaci\u00f3n diamantina (\u201cDDH\u201d) de la campa\u00f1a de perforaci\u00f3n geol\u00f3gica y geot\u00e9cnica de 2022. Los resultados que se informan en este comunicado comprenden 2762 m de perforaci\u00f3n en 12 pozos ubicados en el [&hellip;]","og_url":"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/","og_site_name":"Marimaca","article_published_time":"2023-02-06T13:56:26+00:00","article_modified_time":"2026-03-24T11:04:28+00:00","og_image":[{"width":1920,"height":1440,"url":"https:\/\/marimaca.com\/wp-content\/uploads\/2020\/09\/20-9-28.jpg","type":"image\/jpeg"}],"author":"Antonio Serrano","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Antonio Serrano","Tiempo de lectura":"8 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/#article","isPartOf":{"@id":"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/"},"author":{"name":"Antonio Serrano","@id":"https:\/\/marimaca.com\/es\/#\/schema\/person\/1b14a2c79ba226e74d6a7e418fe9e7b9"},"headline":"Marimaca Anuncia Resultados Finales del Programa de Perforaci\u00f3n Diamante 2022 \u2013 MAD-18 Intercepta 346\u202fm a 0.71% CuT desde 4\u202fm, Incluyendo 90\u202fm a 1.22% CuT desde 54\u202fm","datePublished":"2023-02-06T13:56:26+00:00","dateModified":"2026-03-24T11:04:28+00:00","mainEntityOfPage":{"@id":"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/"},"wordCount":1650,"image":{"@id":"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/#primaryimage"},"thumbnailUrl":"https:\/\/marimaca.com\/wp-content\/uploads\/2020\/09\/20-9-28.jpg","articleSection":["Sin categorizar"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/","url":"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/","name":"Marimaca Anuncia Resultados Finales del Programa de Perforaci\u00f3n Diamante 2022 \u2013 MAD-18 Intercepta 346\u202fm a 0.71% CuT desde 4\u202fm, Incluyendo 90\u202fm a 1.22% CuT desde 54\u202fm - Marimaca","isPartOf":{"@id":"https:\/\/marimaca.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/#primaryimage"},"image":{"@id":"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/#primaryimage"},"thumbnailUrl":"https:\/\/marimaca.com\/wp-content\/uploads\/2020\/09\/20-9-28.jpg","datePublished":"2023-02-06T13:56:26+00:00","dateModified":"2026-03-24T11:04:28+00:00","author":{"@id":"https:\/\/marimaca.com\/es\/#\/schema\/person\/1b14a2c79ba226e74d6a7e418fe9e7b9"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/marimaca.com\/es\/marimaca-announces-final-results-from-2022-diamond-drilling-program-mad-18-intersects-346m-at-0-71-cut-from-4m-including-90m-at-1-22-cut-from-54m\/#primaryimage","url":"https:\/\/marimaca.com\/wp-content\/uploads\/2020\/09\/20-9-28.jpg","contentUrl":"https:\/\/marimaca.com\/wp-content\/uploads\/2020\/09\/20-9-28.jpg","width":1920,"height":1440},{"@type":"WebSite","@id":"https:\/\/marimaca.com\/es\/#website","url":"https:\/\/marimaca.com\/es\/","name":"Marimaca","description":"The Marimaca Copper","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/marimaca.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Person","@id":"https:\/\/marimaca.com\/es\/#\/schema\/person\/1b14a2c79ba226e74d6a7e418fe9e7b9","name":"Antonio Serrano","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","caption":"Antonio Serrano"},"url":"https:\/\/marimaca.com\/es\/author\/admin-marimaca\/"}]}},"_links":{"self":[{"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/posts\/7496","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/comments?post=7496"}],"version-history":[{"count":1,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/posts\/7496\/revisions"}],"predecessor-version":[{"id":10640,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/posts\/7496\/revisions\/10640"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/media\/1057"}],"wp:attachment":[{"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/media?parent=7496"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/categories?post=7496"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/tags?post=7496"},{"taxonomy":"period","embeddable":true,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/period?post=7496"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}