{"id":3455,"date":"2016-05-18T15:12:48","date_gmt":"2016-05-18T19:12:48","guid":{"rendered":"http:\/\/marimaca.com\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/"},"modified":"2020-12-17T07:45:48","modified_gmt":"2020-12-17T12:45:48","slug":"coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp","status":"publish","type":"post","link":"https:\/\/marimaca.com\/es\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/","title":{"rendered":"Coro Subsidiary Options Salvadora Copper Project | Marimaca Copper Corp."},"content":{"rendered":"<p><strong>News Release 16-05<\/strong><\/p>\n<p><strong>May 18\u00a02016, Marimaca Copper Corp.<\/strong>\u00a0(\u201cCoro\u201d or the \u201cCompany\u201d) (TSX Symbol: COP) is pleased to announce that its 65% owned Chilean subsidiary, SCM Berta (\u201cSCMB\u201d), has optioned the Salvadora copper project, located ~ 30km NW of the Nora plant and 58km NE of the port of Cha\u00f1aral in the III Region of Chile. Marimaca Copperpreviously explored Salvadora under option in 2006-7 including a reverse circulation (RC) drill program of 64 RC holes for 8,892m, with results reported on September 20th 2007. A second drill program of 14 RC holes for 3,282m was completed on the property by a private company in 2014.<\/p>\n<p><strong>Purchase Agreement Terms<\/strong><\/p>\n<p>SCMB may acquire a 100% interest in the property by completing the following option payment schedule;<\/p>\n<ul>\n<li>At signing: US$5k<\/li>\n<li>On or before 15 Jun 2016: US$30k<\/li>\n<li>On or before 15 Jul 2016: US$70k<\/li>\n<li>On or before 15 Nov 2016; US$30k<\/li>\n<li>On or before 15 May 2017; US$180k<\/li>\n<li>On or before 15 May 2018; US$250k<\/li>\n<li>On or before 15 May 2019; US$2,440k<\/li>\n<li>Total US$3,005k<\/li>\n<\/ul>\n<p>The final payment can be made in 8 equal instalments of US$305k + interest at LIBOR, and SCMB can start production with the first instalment payment. A 1.5% NSR is payable which can be purchased for $1,500k at any time.<\/p>\n<p>Marimaca Copperalso announces that SCMB has leased the Veronica property, located ~26km W of the Nora plant, for 5 years in return for a production royalty.<\/p>\n<p>Alan Stephens, President and CEO of Marimaca Coppercommented, \u201cSCMB actively intends to access to as many satellite deposits as possible in its area of operation, through property acquisitions and production leases. Our Nora plant provides us with a competitive advantage as most of these deposits are not viable as stand alone operations. We intend to truck ore from the higher grade ones and install leach facilities at the larger, lower grade deposits. Salvadora falls into the latter category and we are pleased to be able to acquire it on reasonable terms. No independent resource estimate has been completed on the property but, based on the existing drilling, we see good potential for 10-15mt @ 0.4 &#8211; 0.5% CuT of leachable mineralization, with a low strip ratio, as shown on Figure 2. Previous bottle roll test work carried out by Marimaca Copperin 2007 indicates that acceptable recoveries and acid consumptions should be achievable. Veronica hosts a 20-30m wide structure previously mined from a small open pit, and offers good potential for a small tonnage, good grade trucking operation. We look forward to further defining both deposits and continue to seek others to add to our inventory.\u201d<\/p>\n<p><strong>About Salvadora<\/strong><\/p>\n<p>Salvadora comprises a NW oriented structure, dipping at ~45o to the SW and hosted by andesitic volcanics intruded by diorite dykes and irregular bodies. Mineralization is of IOCG type and is associated with disseminated specularite and brecciation. Outcrop in the prospect area is limited to a series of small open pits and based on drilling, trenching and geochemistry, the structure has been traced over a strike length of approximately 1000m. It is widest, and mineralization is best developed, over a 600m central section of the structure. Oxidation occurs to vertical depths of 60-100m and sulphide mineralization has been intersected to depths of ~150m.<\/p>\n<p>Alan Stephens, FIMMM, President and CEO, of Marimaca Copper Corp, a geologist with more than 40 years of experience, and a Qualified Person for the purposes of NI 43-101, is responsible for the contents of this news release.<\/p>\n<p><strong>Figure 1: Location of Salvadora<\/strong><\/p>\n<p><strong>Figure 2: Salvadora Cross Section, showing higher grade (pink) with lower grade (yellow) envelope and base of oxidation (red line). Elevations are at 50m intervals<\/strong><\/p>\n<p><strong>CORO MINING CORP.<\/strong><\/p>\n<p><em>\u201cAlan Stephens\u201d<\/em><\/p>\n<p><strong>Alan Stephens<br \/>\nPresident and CEO<\/strong><\/p>\n<p><strong>About Marimaca Copper Corp.:<\/strong><\/p>\n<p>Coro\u2019s strategy is to grow a mining business through the discovery, development and operation of \u201cMarimaca Coppertype\u201d deposits. These are defined as projects at whatever stage of development, that are well located with respect to infrastructure and water, which have low permitting risk, and which have the potential to achieve a short and cost effective timeline to production. Our preference is for open pit heap leach copper projects, where we will seek to minimise capital investment rather than maximise NPV, where we will prioritise profitability over production rate, and finally, where the likely capital cost is financeable relative to our market capitalization. The Company\u2019s assets include its 65% interest in SCM Berta including the Berta and Salvadora deposits; the Marimaca drill stage project; the Planta Prat project; the Llancahue prospect, optioned to Industrias Pe\u00f1oles; and a royalty on the San Jorge copper-gold project located in Argentina.<\/p>\n<p><strong>For further information please visit the Company\u2019s website at\u00a0<\/strong><a href=\"https:\/\/www.coromining.com\/index.html\"><strong>www.coromining.com<\/strong><\/a><strong>\u00a0or contact Michael Philpot, Executive Vice-President at (778) 240\u00a02555 or (604) 682\u00a05546 or\u00a0<\/strong><a href=\"mailto:investor.info@coromining.com\"><strong>investor.info@coromining.com<\/strong><\/a><strong>\u00a0or Fran\u00e7ois Perron at Renmark Financial Communications Inc at (416) 644-2020 or (514) 939-3989 or\u00a0<\/strong><a href=\"mailto:fperron@renmarkfinancial.com\"><strong>fperron@renmarkfinancial.com<\/strong><\/a><strong>\u00a0or\u00a0<\/strong><a href=\"http:\/\/www.renmarkfinancial.com\/\"><strong>www.renmarkfinancial.com<\/strong><\/a><\/p>\n<p>This news release includes certain \u201cforward-looking statements\u201d under applicable Canadian securities legislation. Such forward-looking statements or information, include but are not limited to those with respect to the geological potential and size of Salvadora. Forward-looking statements involve known and unknown risks, uncertainties and other factors which are beyond Coro\u2019s ability to predict or control and may cause Coro\u2019s actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but are not limited to, the operation of the Nora Plant, copper price volatility, and changes in debt and equity markets. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company\u2019s documents filed from time to time with the securities regulators in the Provinces of British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, New Brunswick, Nova Scotia, Prince Edward Island and Newfoundland and Labrador.<\/p>\n<p>Accordingly, readers should not place undue reliance on forward-looking statements. Marimaca Copperundertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>News Release 16-05 May 18\u00a02016, Marimaca Copper Corp.\u00a0(\u201cCoro\u201d or the \u201cCompany\u201d) (TSX Symbol: COP) is pleased to announce that its 65% owned Chilean subsidiary, SCM Berta (\u201cSCMB\u201d), has optioned the Salvadora copper project, located ~ 30km NW of the Nora plant and 58km NE of the port of Cha\u00f1aral in the III Region of Chile. [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[3],"tags":[],"period":[116],"class_list":["post-3455","post","type-post","status-publish","format-standard","hentry","category-sin-categorizar","period-116"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Coro Subsidiary Options Salvadora Copper Project | Marimaca Copper Corp. - Marimaca<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/marimaca.com\/es\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Coro Subsidiary Options Salvadora Copper Project | Marimaca Copper Corp. - Marimaca\" \/>\n<meta property=\"og:description\" content=\"News Release 16-05 May 18\u00a02016, Marimaca Copper Corp.\u00a0(\u201cCoro\u201d or the \u201cCompany\u201d) (TSX Symbol: COP) is pleased to announce that its 65% owned Chilean subsidiary, SCM Berta (\u201cSCMB\u201d), has optioned the Salvadora copper project, located ~ 30km NW of the Nora plant and 58km NE of the port of Cha\u00f1aral in the III Region of Chile. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/marimaca.com\/es\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/\" \/>\n<meta property=\"og:site_name\" content=\"Marimaca\" \/>\n<meta property=\"article:published_time\" content=\"2016-05-18T19:12:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-12-17T12:45:48+00:00\" \/>\n<meta name=\"author\" content=\"Antonio Serrano\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Antonio Serrano\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\\\/\"},\"author\":{\"name\":\"Antonio Serrano\",\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/#\\\/schema\\\/person\\\/1b14a2c79ba226e74d6a7e418fe9e7b9\"},\"headline\":\"Coro Subsidiary Options Salvadora Copper Project | Marimaca Copper Corp.\",\"datePublished\":\"2016-05-18T19:12:48+00:00\",\"dateModified\":\"2020-12-17T12:45:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\\\/\"},\"wordCount\":1028,\"commentCount\":0,\"articleSection\":[\"Sin categorizar\"],\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/marimaca.com\\\/es\\\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\\\/\",\"url\":\"https:\\\/\\\/marimaca.com\\\/es\\\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\\\/\",\"name\":\"Coro Subsidiary Options Salvadora Copper Project | Marimaca Copper Corp. - Marimaca\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/#website\"},\"datePublished\":\"2016-05-18T19:12:48+00:00\",\"dateModified\":\"2020-12-17T12:45:48+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/#\\\/schema\\\/person\\\/1b14a2c79ba226e74d6a7e418fe9e7b9\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/marimaca.com\\\/es\\\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\\\/\"]}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/marimaca.com\\\/es\\\/\",\"name\":\"Marimaca\",\"description\":\"The Marimaca Copper\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/marimaca.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/marimaca.com\\\/es\\\/#\\\/schema\\\/person\\\/1b14a2c79ba226e74d6a7e418fe9e7b9\",\"name\":\"Antonio Serrano\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/?s=96&d=mm&r=g\",\"caption\":\"Antonio Serrano\"},\"url\":\"https:\\\/\\\/marimaca.com\\\/es\\\/author\\\/admin-marimaca\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Coro Subsidiary Options Salvadora Copper Project | Marimaca Copper Corp. - Marimaca","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/marimaca.com\/es\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/","og_locale":"es_ES","og_type":"article","og_title":"Coro Subsidiary Options Salvadora Copper Project | Marimaca Copper Corp. - Marimaca","og_description":"News Release 16-05 May 18\u00a02016, Marimaca Copper Corp.\u00a0(\u201cCoro\u201d or the \u201cCompany\u201d) (TSX Symbol: COP) is pleased to announce that its 65% owned Chilean subsidiary, SCM Berta (\u201cSCMB\u201d), has optioned the Salvadora copper project, located ~ 30km NW of the Nora plant and 58km NE of the port of Cha\u00f1aral in the III Region of Chile. [&hellip;]","og_url":"https:\/\/marimaca.com\/es\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/","og_site_name":"Marimaca","article_published_time":"2016-05-18T19:12:48+00:00","article_modified_time":"2020-12-17T12:45:48+00:00","author":"Antonio Serrano","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Antonio Serrano","Tiempo de lectura":"5 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/marimaca.com\/es\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/#article","isPartOf":{"@id":"https:\/\/marimaca.com\/es\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/"},"author":{"name":"Antonio Serrano","@id":"https:\/\/marimaca.com\/es\/#\/schema\/person\/1b14a2c79ba226e74d6a7e418fe9e7b9"},"headline":"Coro Subsidiary Options Salvadora Copper Project | Marimaca Copper Corp.","datePublished":"2016-05-18T19:12:48+00:00","dateModified":"2020-12-17T12:45:48+00:00","mainEntityOfPage":{"@id":"https:\/\/marimaca.com\/es\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/"},"wordCount":1028,"commentCount":0,"articleSection":["Sin categorizar"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/marimaca.com\/es\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/marimaca.com\/es\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/","url":"https:\/\/marimaca.com\/es\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/","name":"Coro Subsidiary Options Salvadora Copper Project | Marimaca Copper Corp. - Marimaca","isPartOf":{"@id":"https:\/\/marimaca.com\/es\/#website"},"datePublished":"2016-05-18T19:12:48+00:00","dateModified":"2020-12-17T12:45:48+00:00","author":{"@id":"https:\/\/marimaca.com\/es\/#\/schema\/person\/1b14a2c79ba226e74d6a7e418fe9e7b9"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/marimaca.com\/es\/coro-subsidiary-options-salvadora-copper-project-marimaca-copper-corp\/"]}]},{"@type":"WebSite","@id":"https:\/\/marimaca.com\/es\/#website","url":"https:\/\/marimaca.com\/es\/","name":"Marimaca","description":"The Marimaca Copper","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/marimaca.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Person","@id":"https:\/\/marimaca.com\/es\/#\/schema\/person\/1b14a2c79ba226e74d6a7e418fe9e7b9","name":"Antonio Serrano","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/?s=96&d=mm&r=g","caption":"Antonio Serrano"},"url":"https:\/\/marimaca.com\/es\/author\/admin-marimaca\/"}]}},"_links":{"self":[{"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/posts\/3455","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/comments?post=3455"}],"version-history":[{"count":3,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/posts\/3455\/revisions"}],"predecessor-version":[{"id":5584,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/posts\/3455\/revisions\/5584"}],"wp:attachment":[{"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/media?parent=3455"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/categories?post=3455"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/tags?post=3455"},{"taxonomy":"period","embeddable":true,"href":"https:\/\/marimaca.com\/es\/wp-json\/wp\/v2\/period?post=3455"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}